SOLUTIONS AND CASES

Megarevo can work with customers to build a grand blueprint for the energy Internet

User-side

Wancheng Wanchong Energy

Storage Project

 

Time: April 2019

Case location: guangzhou

Installed capacity: 100kw 

Application model: Mega100T

Project Introduction:

Family Optical Storage

Project

 

Time: 2019.3
Case location:wuchuan ,guangzhou
Installed capacity:5kw Hybrid+9.6kwhbatttery
Application model: R5KL1
Project Introduction:

Manila Offline Project,

Philippines

 

Time: May 2019
Case location: Manila Philippines
Installed capacity: 10kw 
Application model: R5KL1
Project Introduction:

300 kW microgrid project

in Thailand

 

Application scenarios:solar Storage Microgrid and Back of Diesel Engine
Installed capacity:3*100kw PCS+3*300kwh battery+3*100kwPV Controller +3*50kVA
Location:Chiang Lai, Thailand
Time:June 2017 
Installation form:Indoor

 

GAC new energy South power grid peak

load regulation and frequency regulation project

 

Application scenarios:Peak shaving frequency modulation
Installed capacity:1MWPCS+1MWwh battery
Location:Guangzhou,Guangdong
Time:june 2019
Installation form:Outdoor Container

 

* Name