Based on the characteristics of C&I loads, Megarevo's solution can effectively solve the customer's transformer capacity limitation, high electricity charge and power cut-off problem. With 98.7% high efficiency conversion, it can help enterprises realize low-carbon sustainable development and shorten the return cycle of customers' investment at the same time;
Safe and reliable
Built-in complete safety protection function, including overcharge, overload, short circuit, etc.
Support manual disconnection of DC input and AC grid, and one-key emergency stop;
Efficient and stable
Wide DC input voltage range;
The efficiency is more than 98.7%;
MPPT accuracy tracking accuracy ≥ 99.9%;
Intelligent& Friendly
Wide temperature operation capability from -40°C to +60°C, altitude height ≥3000m the capacity will be derated;
AC/DC Dual redundant power supply for the control system.
Economical and durable
The design life of the scheme is more than 25 years;
Using a new generation of low-loss IGBT devices, the loss can be obviously reduced by 7.63% compared to FF1400R12IP4;
Guangzhou GAC C&I Energy Storage 1MW/2MWh
As a manufacturing enterprise, GAC New Energy's production energy cost accounts for more than 80% of the company's energy cost. In order to effectively control the energy cost, GAC has adopted a 1MW/2MWh energy storage system, which PCS has selected 2 pcs of MEGA0500 inverter and can help enterprises manage peak load intelligently, and reduce comprehensive energy consumption cost.
We use cookies to understand how our audience uses our site.
megarevo websites use cookies to deliver and improve the website experience, See our cookie policy for further details on how we use cookies and how to change your cookie settings Cookie policy.